Al Khaleej Al Tejari, Dubai
Burj Capital Phase 2 has a been constructed with floor plans to become more productive, flexible and comfortable in all levels of the building. The lobby takes the lead with the 33 meters-long and 6 meters wide large reception area that boasts of double height ceiling and high quality finishes. The tower will contain a pair of densely planned office levels, with every one providing adaptable patterns that may be adjusted to suit individual tenant headquarter or multiple smaller organization suites. There are sixteen high speed elevators as well as specialized service lifts which guarantee ease into the sky even during peak times. The regular floor plan has a lot of spaces that are not obstructed by columns and this plan has been made to promote the natural lights to penetrate inside of the building and at the same time the views offered to people of the canal and the skyline of the city.
NA
750 - 14,100 Sq Ft.
Dec - 2028
Al Barsha South 4, Dubai
858 - 4,201 Sq.Ft
Jul - 2028
MBR City, Dubai
1 & 2 Bedroom
Various Sizes
Announcing - Soon
Nad Al Sheba 1, Dubai
Centurion Group
Office Space
Q4 - 2028
Sobha Group
Apartment
Will Be Update Soon
Omniyat
4,502 - 7,758 Sq Ft.
Damac Properties
Studio, 1, 2 & 3 Bedroom
442 - 2,025 Sq Ft.